All Courses
Early Year Courses
Construction Courses
Carpentry and Joinery
Reference: ST0264
Version: 1.4
Level: 2
Options: Site Carpenter, Architectural Joiner Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment
Version: 1.4
Level: 2
Options: Site Carpenter, Architectural Joiner Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment
Duration
Painting & Decorating Courses
Reference: ST0295
Version: 1.3
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Version: 1.3
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Duration
Property Maintenance Courses
Reference: ST0171
Version: 1.1
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment
Version: 1.1
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment
Duration
Interior System
Reference: ST0388
Version: 1.0
Level: 2
Typical duration to gateway: 24 months (this does not include EPA period)
Version: 1.0
Level: 2
Typical duration to gateway: 24 months (this does not include EPA period)
Duration
Craft Bricklayer L3
Reference: ST1334 Version: 1.1
Level: 3
Typical duration to gateway: 18 months Typical EPA period: 3 months
Route: Construction and the built environment
Level: 3
Typical duration to gateway: 18 months Typical EPA period: 3 months
Route: Construction and the built environment
Duration
Bricklaying
Reference: ST0095
Version: 1.2
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment EQA provider: Ofqual
Version: 1.2
Level: 2
Typical duration to gateway: 24 months Typical EPA period: 3 months
Route: Construction and the built environment EQA provider: Ofqual
Duration
Plastering L2
Reference: ST0096
Version: 2.1
Level: 2
Options: solid Plasterer, fibrous Plasterer Typical duration to gateway: 24 months Typical EPA period: 3 months
Version: 2.1
Level: 2
Options: solid Plasterer, fibrous Plasterer Typical duration to gateway: 24 months Typical EPA period: 3 months